ENIT

EC0107SI0402 - GENIE INDUSTRIEL

Objectifs

L'objectif de cet enseignement est de permettre �n �diant d'�e capable de comprendre la structure de l'entreprise et d'identifier les fonctions industrielles partie prenante dans le d�loppement d'un produit en tenant compte du caract� transversal du g�e industriel ainsi que des facteurs humains. L'�diant sera �lement capable de ma�iser deux outils du g�e industriel lui permettant de l'aider dans son travail d'�ve ing�eur, notamment en stage�: le diagramme de Gantt et la m�ode de Pareto.
et la méthode de Pareto.

The objective of this course is to allow a student to be able to understand the structure of a company and to identify the main industrial functions (i.e. the stakeholders involved during the development of a product) taking into account human factors. The student will be able to use two main useful tools in order to help her/him during her/his studies : the Gantt diagram and the Pareto method.

Présentation

Introduction au G�e industriel (sch� d'entreprise, organisations)
Pr�ntation des Fonctions/Processus (dans l'ordre logique de d�loppement d'un produit)
o Conception, innovation (marketing, �blissement de sp�fications�: AF, d�nition, prototypage)
o Industrialisation (implantation de moyens�: usine, cha�, + m�odes de production�: gammes)
o Production (typologie des syst�s, ordonnancement des t�es, contr�le de la qualit�o Logistique (approvisionnement, distribution, achats, manutention, stockage, planification, pr�sion)
o Maintenance (Maintien en conditions op�tionnelles, soutien logistique, s�ret�e fonctionnement)
Pr�ntation de deux outils du g�e industriel essentiels �'organisation du travail d'un �ve ing�eur et d'un ing�eur en situation op�tionnelle�:
o M�ode de Pareto�: un outil permettant de classifier un grand nombre d'�ments selon un crit� significatif,
o Diagramme de Gantt�: un outil de communication et de pilotage de projet.

util de communication et de pilotage de projet.


Introduction to Industrial Engineering (companies structures, organisations)
Presentation of the functions/Processes (chronological order during the development of a product)
o Conception, innovation (marketing, requirements definition, prototyping...)
o Industrialisation (shop configuration, definition of production routings...)
o Production (typologies of production systems, activity scheduling, quality control...)
o Logistic (supplying, delivery, purchasing, inventory control, material handling, planing, forecasting)
o Maintenance (sustainability, dependability)
Presentation of two main tools for the organisation of the work of an engineer student or an engineer in operational conditions:
o Pareto method�: a tool which allows to classify a great number of elements with regards to a significant criteria,
o Gantt chart�: a tool to communicate and manage projects.

Pré-requis


None

Recommandations

Travail personnel 2H/Semaine

Conditions d'évaluation

(2*DS1+1*TP1+2*DS2+1*TP2)/6

TP1 : Travaux Pratiques 1

TP2 : Travaux Pratiques 2

DS1 : Devoir Surveillé 1

DS2 : Devoir Surveillé 2

Bibliographie

Gestion de la production, calcul �nomique / V. Giard. Economica


Gestion de la production, calcul �nomique / V. Giard. Economicaca

En bref

Langue d'enseignement : français

Contact(s)

Composante

Contactez l'ENI de Tarbes

47, avenue d'Azereix - BP 1629 - 65016 Tarbes CEDEX

+33 (0)5 62 44 27 00

  • Région Occitanie
  • Erasmus +
  • Logo midisup
  • Logo CGE
  • Logo UTFTMP
  • Logo CTI
  • Logo CDEFI
  • Logo MENESR